Close Menu
Greentimes
    Qoui de neuf

    Morocco: Committed to a Common African Action for a Green and Prosperous Future (Mrs. Benali)

    1 August 2025

    Water Stress: The Casablanca-Settat Regional Water Authority Accelerates the Construction of Monobloc Stations

    1 August 2025

    Electricity Autoproduction: Morocco Finalizes Its Regulatory Framework

    1 August 2025
    Facebook X (Twitter) Instagram
    GreentimesGreentimes
    • Home
    • CSR
    • Energy Transition and Renewables
    • Sustainability
    • Climate Change
    • Analyses and Opinions
    • Datas
    • Dates & events
    • Last news
    • FR
    Saturday 2 August 2025
    Facebook X (Twitter) Instagram
    Greentimes
    Home » Ailong installs its first wind turbine blade factory outside of China in Nador.
    Energy Transition and Renewables

    Ailong installs its first wind turbine blade factory outside of China in Nador.

    19 May 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    The Chinese group Ailong Technology, a private player in the wind energy sector, is set to inaugurate its first international production unit in the city of Nador. This project marks a strategic milestone for the Asian industrialist, who has chosen northeastern Morocco to begin its establishment outside its borders.

    An ambitious production capacity

    The factory, whose construction is in the finalization phase, aims for an annual production of 750 sets of blades, each measuring 87.5 meters long. This industrial site represents a significant advancement for the region, with a modern infrastructure designed to meet the most demanding environmental standards.

    Eco-responsible design and digital monitoring

    From its conception, the project has been aligned with a sustainable logic: the materials used have a low carbon footprint, while an intelligent environmental monitoring system has been integrated. The energy management of the site will rely on a dedicated digital platform, optimizing resource consumption. As for industrial waste, its treatment will be entrusted to certified service providers, in accordance with current environmental regulations.

    A mixed construction site in the finishing phase

    On-site, a mixed Moroccan and Chinese workforce is working to finalize the production lines inside the hangars. Outside, the development work continues, particularly in the storage areas. The official launch of the factory is scheduled before the end of May.

    With Barlamane

    Ailong first installs turbine Wind
    Previous ArticleCSR: Marsa Maroc structures its action around an autonomous entity called Ports4Impact.
    Next Article Nador: 7,700 hectares of forests to be replanted by 2030 as part of the national strategy.

    Related Posts

    Morocco: Committed to a Common African Action for a Green and Prosperous Future (Mrs. Benali)

    1 August 2025

    Electricity Autoproduction: Morocco Finalizes Its Regulatory Framework

    1 August 2025

    Energy: towards an electrical connection between Morocco and Portugal?

    29 July 2025
    Leave A Reply Cancel Reply

    Ne ratez pas
    Energy Transition and Renewables

    Morocco: Committed to a Common African Action for a Green and Prosperous Future (Mrs. Benali)

    1 August 20250

    The Minister of Energy Transition and Sustainable Development, Leila Benali, affirmed on Thursday, July 24,…

    Water Stress: The Casablanca-Settat Regional Water Authority Accelerates the Construction of Monobloc Stations

    1 August 2025

    Electricity Autoproduction: Morocco Finalizes Its Regulatory Framework

    1 August 2025

    Fertilizer: OCP Nutricrops exceeds 5 million tons of TSP production.

    29 July 2025
    Restez connecté
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Nos vidéos

    The circular economy at the heart of LabelVie group’s initiatives.

    10 July 2025

    Mounir El Bari: “Our great ecological challenge is access to the resource!”

    10 July 2025

    Driss Nahya: “Control must be strengthened to access the waste deposit.”

    10 July 2025

    Reda Boukallal: “Priority to the valorization of household waste”

    10 July 2025
    Facebook X (Twitter) Instagram Pinterest
     
    © 2025 Green Times.

    Type above and press Enter to search. Press Esc to cancel.