Close Menu
Greentimes
    Qoui de neuf

    Launch of the Solar Rooftop 500 Program for the Deployment of Solar Energy on Rooftops

    6 February 2026

    Transformation of ONHYM: Green Light from the House of Representatives

    5 February 2026

    Secoex Renovables Prepares for Its Launch in the Moroccan Solar Self-Consumption Market

    5 February 2026
    Facebook X (Twitter) Instagram
    GreentimesGreentimes
    • Home
    • CSR
    • Energy Transition and Renewables
    • Sustainability
    • Climate Change
    • Analyses and Opinions
    • Datas
    • Dates & events
    • Last news
    • FR
    Friday 6 February 2026
    Facebook X (Twitter) Instagram
    Greentimes
    Home » Managem and Wärtsilä Join Forces for a Power Plant in Senegal
    Energy Transition and Renewables

    Managem and Wärtsilä Join Forces for a Power Plant in Senegal

    22 September 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    The Finnish group Wärtsilä has signed a five-year contract with Boto SA, a subsidiary of Moroccan company Managem, to ensure the operation and maintenance of a 23 MW power plant intended for the gold project in Boto, in eastern Senegal.

    Located 88 km from Kédougou, near the borders with Mali and Guinea, this off-grid facility will supply power to a gold mine using six Wärtsilä 32 engines of 2.7 MW and four 1.5 MW diesel generators. The agreement includes digital tools for remote assistance and anomaly detection powered by artificial intelligence.

    For Driss Mounji, Director of International Operations at Managem, this partnership represents “a decisive step” to enhance the reliability and efficiency of gold production while preparing for the future integration of renewable solutions.

    On his part, Marc Thiriet, Africa Director of Wärtsilä Energy, emphasizes that this first power plant owned by Managem illustrates the joint commitment to provide competitive energy to the African mining sector, in line with the objectives of the Emerging Senegal Plan (PSE). The technical flexibility of the system will later allow for the integration of solar energy.

    Beyond the mine, the project is also expected to stimulate the local economy by creating jobs in the Kédougou region while supporting Senegal’s ambitions in industrialization and energy independence.

    With Barlamane.

    artificial intelligence Boto employment Energy Kédougou Managem mining renewable energy Senegal Wärtsilä
    Previous ArticleAfrican Atlantic Pipeline: A Strategic Lever for Energy and Economic Integration in Africa
    Next Article Jorf Lasfar: OCP and INNOVX Transform Captured CO₂ into Industrial and Agricultural Resources

    Related Posts

    Launch of the Solar Rooftop 500 Program for the Deployment of Solar Energy on Rooftops

    6 February 2026

    Transformation of ONHYM: Green Light from the House of Representatives

    5 February 2026

    Secoex Renovables Prepares for Its Launch in the Moroccan Solar Self-Consumption Market

    5 February 2026
    Leave A Reply Cancel Reply

    Ne ratez pas
    Energy Transition and Renewables

    Launch of the Solar Rooftop 500 Program for the Deployment of Solar Energy on Rooftops

    6 February 20260

    The Solar Rooftop 500 (SR500) program, aimed at deploying 500 MWp of rooftop solar and…

    Transformation of ONHYM: Green Light from the House of Representatives

    5 February 2026

    Secoex Renovables Prepares for Its Launch in the Moroccan Solar Self-Consumption Market

    5 February 2026

    Afforestation: The Court of Auditors Highlights a Waste of 92 Million Dirhams in the Waters and Forests Sector

    5 February 2026
    Restez connecté
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Nos vidéos

    The circular economy at the heart of LabelVie group’s initiatives.

    10 July 2025

    Mounir El Bari: “Our great ecological challenge is access to the resource!”

    10 July 2025

    Driss Nahya: “Control must be strengthened to access the waste deposit.”

    10 July 2025

    Reda Boukallal: “Priority to the valorization of household waste”

    10 July 2025
    Facebook X (Twitter) Instagram Pinterest
     
    © 2026 Green Times.

    Type above and press Enter to search. Press Esc to cancel.